
Office Partitions & Partition Walls Sydney
Plasterboard, acoustic, fire-rated, glazed and demountable systems — built to the certified system, with the documentation to prove the rating.
The wall is the easy part.
The rating, the junction and the deflection head are the job. Anyone can stand up a stud wall; building one that holds its acoustic rating and does not crack when the slab moves is a different trade.
What we install
Plasterboard partitions
Metal stud and plasterboard to ceiling or slab, level 4 or 5 finish.
Acoustic partitions
Multiple board layers, insulation, resilient mounts, sealed at every junction.
Fire-rated partitions
Certified systems for the required FRL, with rated penetrations and collars.
Tenancy demising walls
Fire and acoustically rated to slab, with deflection head, to landlord spec.
Glazed office fronts
Framed and frameless, sliding, hinged and pivot doors, manifestation.
Curved and feature walls
Curved partitions, raked walls, feature linings and shadowline detail.
Choosing the right wall
| Application | Typical build | Height | Typical rating |
|---|---|---|---|
| Open-plan divider | Single stud, single board each side | To ceiling | Around Rw 35 |
| Meeting room | Single stud, insulation, sealed | Ceiling or slab | Rw 40–45 |
| Boardroom / HR | Double board each side, acoustic insulation | To slab, deflection head | Rw 50+ |
| Tenancy demising | Fire and acoustic rated system, landlord spec | To slab, deflection head | Per lease / NCC |
| Fire-separating | Certified system, rated penetrations | To slab | FRL as specified |
| Glazed office front | Framed or frameless on a built head and jamb | Full height or to bulkhead | Rw 35–45 |
Ratings are indicative of common commercial specifications. We build to the rating nominated in your documentation, and will tell you if the drawn detail will not achieve it.
Where they go
- Meeting rooms and boardrooms
- Private and glazed offices
- Open-plan zoning
- Tenancy demising walls
- Reception and feature walls
- Comms and back-of-house
- Secure bank branch partitions
- Clinic and consulting suites
- Amenities and wet areas
- Strip out and reconfiguration
Where we work
Partition installation across Sydney, including after-hours works in occupied buildings and trading centres.
- Sydney CBD
- Barangaroo
- The Rocks
- Pyrmont
- Surry Hills
- North Sydney
- St Leonards
- Chatswood
- Macquarie Park
- Rhodes
- Parramatta
- Norwest
- Sydney Olympic Park
- Alexandria
- Mascot
- Rosebery
- Zetland
- Bondi Junction
- Double Bay
- Miranda
- Liverpool
- Fairfield
- Wetherill Park
- Smithfield
- Bankstown
- Silverwater
- Auburn
- Castle Hill
Partition wall questions
Should a partition go to the ceiling or to the slab?
A wall stopping at the ceiling is cheaper, but sound travels straight over it through the plenum — so meeting rooms built that way are not confidential. To the underside of slab, sealed and insulated with a deflection head, is what boardrooms, HR offices and demising walls need.
What acoustic rating do I need for a meeting room?
Roughly: Rw 35 for an open-plan divider, Rw 40–45 for a standard meeting room, Rw 50+ where speech must not be intelligible next door. The rating is a system question — stud gauge and centres, board layers, insulation, sealant and how penetrations are treated all matter.
Can you build fire-rated walls?
Yes, to the certified system for the required FRL, with correctly rated penetrations, collars and sealants. Substituting a component invalidates the rating, so we build to the tested system and issue certification at handover.
Do you install glass office partitions?
Single and double glazed office fronts, frameless and framed, sliding, hinged and pivot doors, acoustic glazing and manifestation — plus the framing, bulkheads and junctions the glazing meets.
What is a tenancy demising wall?
The wall separating your tenancy from the next or from base building. Usually fire and acoustically rated, to underside of slab with a deflection head, and built to the landlord’s specification rather than yours.
Can partitions be installed after hours?
Yes, and in occupied buildings they usually are. Framing and board fixing are the noisy activities, so we programme them into night shifts and make good before the floor reopens.

Send the partition plan.
We price off your wall legend and flag any detail that will not achieve the nominated rating.